Yadin Bridges
Haifa, Israel
Project Description
​
This five span, 200m long bridge, in conjunction with the Kishon-Yadin bridges and Carmel Tunnels Project, is part of an improvement plan for the transportation corridor through Haifa's downtown and port area. The bridge is precast segmental and constructed with ground based cranes in balanced cantilever.
__________________________________________________________________
Our Role
​
Hatcher Technical worked with co-designer and construction engineer McNary Bergeron & Johannesen to develop construction shop drawings.
​
Areas of the project that Hatcher Technical worked on included:
-
Precast superstructure segments
Location
​
Haifa, Israel
​
Owner
Israel National Roads Company, Ltd.
​
Contractor
​
Solel Boneh
​
Designer
​
ZZZ Engineering
McNary Bergeron & Associates
Total Contract Value
​
$30 million
​
Timeline
​
2006 - 2009
​
Construction Method
​
-
Precast segmental
-
Balanced cantilever using an overhead launching gantry
-
Adjacent girders connected using a cast-in-place closure strip