top of page
Clandeboye Dairy Factory.jpg

Dairy Processing Facilities

New Zealand, Australia, Indonesia

Cheese Production Facility

This new cheese production facility was built by Ebert Construction in Te Rapa, Waikato, New Zealand.

__________________________________________________________________

 

Our Role

Jason Hatcher was a general site foreman for the main contractor, Ebert Construction, overseeing day-to-day construction activities, including construction of prestressed concrete floor slabs.

Location

Te Rapa, Waikato, New Zealand

Owner

 

Anchor Dairy Products Ltd

Contractor

Ebert Construction

Designer

Total Contract Value

NZ$3 million

Timeline

1997

Construction Method

Structural steel framing with prestressed concrete floor slab and EPS wall panels

Whey Dryer Building

This new whey dryer building for Alpine Cooperative Dairy Company in Clandeboye, South Canterbury, New Zealand, was the largest in the world when completed. With construction complete, production started in September, 1996.

__________________________________________________________________

 

Our Role

Jason Hatcher was a senior draftsman, working with the structural design engineers, process design engineers, and contractor to develop working design and construction drawings.

Location

Clandeboye, South Canterbury, New Zealand

Owner

 

Alpine Cooperative Dairy Company

Contractor

Ebert Construction

Designer

Ormond Stock Associates (Structural Engineer)

Niro New Zealand Ltd (Process Engineer)

Total Contract Value

NZ$8 million

Timeline

1995

Construction Method

Structural steel framing with concrete slab ground floor, and steel decks and platforms throughout, with structural framing system to support process equipment, and EPS wall panels

PT Sari Husada Dryer Building

PT Sari Husada in Yogjakarta, Indonesia, needed another dryer for their inner city site. This 32 m tall dryer building was completed to international hygiene standards.

__________________________________________________________________

 

Our Role

Jason Hatcher was a senior draftsman, working with the structural design engineers, process design engineers, and contractor to develop working design and construction drawings.

Location

Yogjakarta, Indonesia

Owner

 

PT Sari Husada

Contractor

Designer

Ormond Stock Associates (Structural Engineer)

Paul Williams Group (Process Engineer)

Total Contract Value

Timeline

1995

Construction Method

Structural steel framing with concrete slab ground floor, and steel decks and platforms throughout, with structural framing system to support process equipment, and EPS wall panels

Whey Dryer Building

A new whey dryer building for Bega Cooperative Dairy Company in Bega, NSW, Australia.

__________________________________________________________________

 

Our Role

Jason Hatcher was a senior draftsman, working with the structural design engineers, process design engineers, and contractor to develop working design and construction drawings.

Location

Bega, New South Wales, Australia

Owner

 

Bega Cooperative Dairy Company

Contractor

Designer

Ormond Stock Associates (Structural Engineer)

Paul Williams Group (Process Engineer)

K Gordon (Architect)

Total Contract Value

AU$3 million

Timeline

1994

Construction Method

Structural steel framing with concrete slab ground floor, and steel decks and platforms throughout, with structural framing system to support process equipment, and EPS wall panels

Dry Process Redevelopment Building

A new dry process building, complete with an extensive interior support system, structural steel decks and platforms throughout, and alterations to adjoining buildings.

__________________________________________________________________

 

Our Role

Jason Hatcher was a senior draftsman, working with the structural design engineers, process design engineers, and contractor to develop working design and construction drawings.

Location

Kapuni, Taranaki, New Zealand

Owner

 

Lactose Company of New Zealand

Contractor

Designer

Ormond Stock Associates (Structural Engineer)

Paul Williams Group (Process Engineer)

Total Contract Value

NZ$3 million

Timeline

1994

Construction Method

Structural steel framing with concrete slab ground floor, and steel decks and platforms throughout, with structural framing system to support process equipment, and EPS wall panels

Whey Processing Building

A new whey processing building, complete with an extensive interior support system, structural steel decks and platforms throughout.

__________________________________________________________________

 

Our Role

Jason Hatcher was a senior draftsman, working with the structural design engineers, process design engineers, and contractor to develop working design and construction drawings.

Location

Longurn, New Zealand

Owner

 

Tui Dairy Products

Contractor

Designer

Ormond Stock Associates (Structural Engineer)

Total Contract Value

NZ$2.5 million

Timeline

1994

Construction Method

Structural steel framing with concrete slab ground floor, and steel decks and platforms throughout, with structural framing system to support process equipment, and EPS wall panels

bottom of page