Dairy Processing Facilities
New Zealand, Australia, Indonesia
Cheese Production Facility
This new cheese production facility was built by Ebert Construction in Te Rapa, Waikato, New Zealand.
__________________________________________________________________
Our Role
Jason Hatcher was a general site foreman for the main contractor, Ebert Construction, overseeing day-to-day construction activities, including construction of prestressed concrete floor slabs.
Location
Te Rapa, Waikato, New Zealand
Owner
Anchor Dairy Products Ltd
Contractor
Ebert Construction
Designer
Total Contract Value
NZ$3 million
Timeline
1997
Construction Method
Structural steel framing with prestressed concrete floor slab and EPS wall panels
Whey Dryer Building
This new whey dryer building for Alpine Cooperative Dairy Company in Clandeboye, South Canterbury, New Zealand, was the largest in the world when completed. With construction complete, production started in September, 1996.
__________________________________________________________________
Our Role
Jason Hatcher was a senior draftsman, working with the structural design engineers, process design engineers, and contractor to develop working design and construction drawings.
Location
Clandeboye, South Canterbury, New Zealand
Owner
Alpine Cooperative Dairy Company
Contractor
Ebert Construction
Designer
Ormond Stock Associates (Structural Engineer)
Niro New Zealand Ltd (Process Engineer)
Total Contract Value
NZ$8 million
Timeline
1995
Construction Method
Structural steel framing with concrete slab ground floor, and steel decks and platforms throughout, with structural framing system to support process equipment, and EPS wall panels
PT Sari Husada Dryer Building
PT Sari Husada in Yogjakarta, Indonesia, needed another dryer for their inner city site. This 32 m tall dryer building was completed to international hygiene standards.
__________________________________________________________________
Our Role
Jason Hatcher was a senior draftsman, working with the structural design engineers, process design engineers, and contractor to develop working design and construction drawings.
Location
Yogjakarta, Indonesia
Owner
PT Sari Husada
Contractor
Designer
Ormond Stock Associates (Structural Engineer)
Paul Williams Group (Process Engineer)
Total Contract Value
Timeline
1995
Construction Method
Structural steel framing with concrete slab ground floor, and steel decks and platforms throughout, with structural framing system to support process equipment, and EPS wall panels
Whey Dryer Building
A new whey dryer building for Bega Cooperative Dairy Company in Bega, NSW, Australia.
__________________________________________________________________
Our Role
Jason Hatcher was a senior draftsman, working with the structural design engineers, process design engineers, and contractor to develop working design and construction drawings.
Location
Bega, New South Wales, Australia
Owner
Bega Cooperative Dairy Company
Contractor
Designer
Ormond Stock Associates (Structural Engineer)
Paul Williams Group (Process Engineer)
K Gordon (Architect)
Total Contract Value
AU$3 million
Timeline
1994
Construction Method
Structural steel framing with concrete slab ground floor, and steel decks and platforms throughout, with structural framing system to support process equipment, and EPS wall panels
Dry Process Redevelopment Building
A new dry process building, complete with an extensive interior support system, structural steel decks and platforms throughout, and alterations to adjoining buildings.
__________________________________________________________________
Our Role
Jason Hatcher was a senior draftsman, working with the structural design engineers, process design engineers, and contractor to develop working design and construction drawings.
Location
Kapuni, Taranaki, New Zealand
Owner
Lactose Company of New Zealand
Contractor
Designer
Ormond Stock Associates (Structural Engineer)
Paul Williams Group (Process Engineer)
Total Contract Value
NZ$3 million
Timeline
1994
Construction Method
Structural steel framing with concrete slab ground floor, and steel decks and platforms throughout, with structural framing system to support process equipment, and EPS wall panels
Whey Processing Building
A new whey processing building, complete with an extensive interior support system, structural steel decks and platforms throughout.
__________________________________________________________________
Our Role
Jason Hatcher was a senior draftsman, working with the structural design engineers, process design engineers, and contractor to develop working design and construction drawings.
Location
Longurn, New Zealand
Owner
Tui Dairy Products
Contractor
Designer
Ormond Stock Associates (Structural Engineer)
Total Contract Value
NZ$2.5 million
Timeline
1994
Construction Method
Structural steel framing with concrete slab ground floor, and steel decks and platforms throughout, with structural framing system to support process equipment, and EPS wall panels