Surrey Langley SkyTrain
Vancouver, British Columbia, Canada
Project Description
​
The area south of the Fraser River is one of the fastest growing areas in the Vancouver region. The population of Surrey, Langley City, and Langley Township is projected to increase by 420,000 people and add 147,000 new jobs by the year 2050. As the population in communities south of the Fraser River continues to grow, so does demand for Transit.
​
The Surrey Langley SkyTrain will improve transportation options, increase access to housing and services such as childcare and heath care, support healthy communities and the environment and foster economic development.
​
The project extends the Expo Line 16 kilometres, primarily along the Fraser Highway on an elevated guideway from King George Station in Surrey to 203rd Street in Langley City. It includes eight new stations and three transit exchanges at the Bakerview-166 Street, Willowbrook and Langley City Centre Stations.
​
The budget for the Surrey Langley SkyTrain is CAD$5.996 billion, which includes capital costs and active transportation investments.
​
The anticipated in-service date is late 2029.
Location
​
Surrey to Langley
Vancouver, British Columbia, Canada
​
Owner
​
British Columbia Ministry of
Transportation and Transit
​
Contractor
​
SkyLink Guideway Partners
(Dragados Canada, Inc., and
Ledcor Investments Inc.)
​
Designer
​
SYSTRA International Bridge Technologies
Total Contract Value
​
CAD$5.996 billion
​
Timeline
​
2024 - 2029
​
Construction Method
​
-
Precast segmental guideway
-
Cast-in-place foundations and substructure
-
Structural steel box section spans
__________________________________________________________________
Our Role
​
Hatcher Technical is engaged by SYSTRA International Bridge Technologies (SYSTRA-IBT) as a consultant. Tasks include preparing a complete bill of quantities for the 421 span elevated guideway, including all deep foundations (drilled shafts and driven piles) and pile caps, substructure including all pier columns, pier caps, crossbeams and straddle bents, and superstructure including precast segmental box segments, cast-in-place box sections, and steel tub composite deck box sections.
​
Hatcher Technical also worked with the SYSTRA-IBT design team to optimize the guideway superstructure reinforcement design and configuration, including constructability reviews and assessments.