top of page
7WZ7HKC6CFAPHAHXAXEPCLFYYI.jpg

I-59 / 20 Replacement

Birmingham, Alabama

Project Description

The I59/20 CBD carries heavily traveled Interstate 59 and Interstate 20 through downtown Birmingham. The new bridges replace existing steel plate girder bridges built in the early 1970s. The new bridges carry up to five travel lanes and shoulders in both the eastbound and westbound direction. Alignments of the new bridges follow the existing alignments, with construction progressing with bridge demolition.

 

Separate eastbound and westbound structures, each with a length of approximately 6,500 ft, carry mainline traffic. Each of these bridges is comprised of two precast box girders joined by a longitudinal closure joint. The combined widths vary from 70’ to 94’. Span lengths vary from 110’ to 165’ and were constructed by the span-by-span method with external post-tensioning tendons. These mainline bridges, along with two segmental ramp structures, total 1 million square feet of elevated bridge deck.

Corven Engineering created the final design of the precast segmental superstructure.

The Alabama Department of Transportation (ALDOT) awarded the contract for the third and final phase of the bridge replacement project for Interstate 59/20 (I-59/20) in Birmingham to Johnson Bros. Corp. The company bid $474.7 million.

Aspire Bridge Magazine Article: Alabama's Largest Transportation Project Renews Birmingham's Central Business District

Aspire Bridge Magazine Article: Time-Saving Construction Techniques - I-59 / I-20 Bridge Reconstruction

 

Awards

American Segmental Bridge Institute (ASBI) 2021 Bridge Award of Excellence

__________________________________________________________________

 

Our Role

Working with construction engineer, McNary Bergeron & Associates, Hatcher Technical produced 3D CAD models of the precast expansion and pier segments to integrate the post-tensioning hardware with the reinforcement.

 

The models were used to identify and resolve conflicts and guide the production of construction shop drawings. Hatcher Technical produced construction shop drawings for 100 pier segments and 78 expansion segments.

Location

Birmingham, Alabama

Owner

 

Alabama Department of Transportation

Contractor

Johnson Bros.

Designer

Volkert / Corven Engineering

Construction Engineer

McNary Bergeron & Associates

Total Contract Value

$475 Million

Timeline

2019 - 2021

Construction Method

Precast segmental superstructure erected using the span by span method on falsework. 2,316 total precast segments.

bottom of page