Carmel Tunnel Bridges (Rupin Interchange Bridges)

Haifa, Israel

Project Description

​

The Carmel Tunnel project will alleviate traffic congestion in central Haifa by allowing vehicles to bypass the central part of the city. The $300 million project consists of two 5-km long tunnels through Mount Carmel, 5 conventional bridges, 6 segmental bridges, and 11 kilometers of roads which will link the tunnels to Israel's highway system.

__________________________________________________________________

 

Our Role

​

Hatcher Technical worked with co-designer and construction engineer McNary Bergeron & Johannesen to develop construction shop drawings.

​

Areas of the project that Hatcher Technical worked on included:

  • Precast superstructure segments

Location

​

Haifa, Israel

​

Owner

 

Build-Operate-Transfer (BOT) project

financed by Carmelton Group, Ltd.

​

Contractor

​

Ashtrom Engineering & Construction /

Solel Boneh Ltd. (Joint Venture)

​

Designer

​

ZZZ Engineering

McNary Bergeron & Associates

Total Contract Value

​

$300 million

​

Timeline

​

2006 - 2010

​

Construction Method

​

  • Precast segmental (three bridges)

    • Cast-in-place concrete piers

    • Balanced cantilever using ground based cranes

    • 154 total precast segments

  • Cast-in-place segmental (three bridges)

    • Balanced cantilever using form travellers

    • 151 total cast-in-place segments