I-59/20 CBD Bridge Replacement

Birmingham, Alabama

 

Project Description

The Alabama Department of Transportation (ALDOT) awarded the contract for the third and final phase of the bridge replacement project for Interstate 59/20 (I-59/20) in Birmingham to Johnson Bros. Corp. The company bid $474.7 million.

The elevated portions of I-59/20 through downtown Birmingham's Central Business District (CBD) are over 40 years old and in disrepair. Current usage of I-59/20 is approximately 160,000 vehicles per day which is twice the design capacity, requiring the replacement and upgrade of the viaduct.

The bridges are designed to be erected using the span-by-span construction method utilizing falsework towers. The construction schedule includes a one-year shut down of I-59/20 through Birmingham, starting in the Fall of 2018 during which time the precast segments will be erected.


 

         Services by Hatcher Technical

Hatcher Technical worked with construction engineer McNary Bergeron and contractor Johnson Bros. to provide:


  • Fully integrated shop drawings for the 108 precast expansion segments
  • Fully integrated shop drawings for the 236 precast pier segments
  • Fully integrated conflict free 3D models of the precast expansion segments
  • Fully integrated conflict free 3D models of the precast pier segments